Metal roofing and cladding engineered to outlast the building around it.
Titanium, zinc, copper, and stainless systems fabricated in-house for architects who need a material that performs for a hundred years, not ten.
service life
Four metals, one standard — it has to earn its place on the building.
We fabricate in the materials most shops won't touch, because they're chosen for how they age, not just how they arrive on site.
One fabrication shop, four building envelopes.
Roofing, siding, cladding, and column covers — detailed, panelized, and shipped ready for install, with AutoCAD shop drawings for every run.

Roofing
Standing seam, snap-lock, and mechanical-lock systems built for wind and snow load.

Cladding
Flat-lock, flush wall, and dry-lock rainscreen panels for signature facades.

Columns
Cylindrical and rectilinear covers fabricated to exact architectural spec.

Custom Fabrication
In-house CNC forming and AutoCAD detailing for non-standard geometry.

Coastal titanium roof, zero coating maintenance since install.
Specified for direct salt-air exposure where standard metal roofing fails within a decade — this titanium standing-seam system carries the same 100-year rated life as the day it was installed.
View the full project gallery →From spec to shipped panel
One fixed process regardless of material, because tolerances matter more in titanium and copper than almost anything else on a building.
Spec & material review
Exposure, geometry, and budget determine material selection alongside your design team.
Shop drawings
In-house AutoCAD detailing sets panelization, seam layout, and flashing.
CNC fabrication
Panels formed to tolerance with dedicated tooling for each material.
Ship & install support
Panelized, labeled, sequenced — with support through close-out.
Bring us the geometry. We'll tell you what material can actually do it.
Recent work
A running record of what's been fabricated and installed — browse the full project archive by category.
Ready to spec your project?
Send drawings, exposure conditions, and timeline. We'll return a material recommendation and budget range within 3 business days.









